Restricted Hours Noise Monitoring Results -- Evening time 
Station M5a, Chuk Lam Ming Tong
Date Start Time End Time  Weather Noise level (dB(A)), 5 min Major Construction Noise Source(s) Observed Other Noise Source(s) Observed Remarks Temp. (°C) Wind Speed (m/s) Noise Meter Model / ID Calibrator Model / ID
Leq L10 L90
27-Aug-13 22:45 23:00 Fine 59 60 51 Works in tunnel Road traffic at San Wan Drive  According to contractor, general construction works was in process accordance to CNP. 29.3 <5 B&K 2238  S/N : 2381580 B&K 4231  S/N: 3004068
                           
Min. 59.0
Max. 59.0